Sunday, September 27, 2020
Slow Sunday Stitching
Monday, September 21, 2020
Where is that Piece of Fabric?
I got this far on this Ella block on Sunday but could not find the last petal in that coral colour. I wasn't sure what name to give to it but one of the girls called it coral.
I looked high. I looked low. I looked on the floor and under the tables. Then I went through every box of fabrics here that it might have been in. I even looked through all the see-through boxes on the shelf with all the small stuff in them. And I found a spool of coral or dusty rose cotton thread to match but not the petal nor the piece of fabric it came from. Now, if you recall, I am using a 10-inch square pack of Betsy McKutchian's Susannah Scraps and there was only a 10 inch square of that fabric. What to do? But I have matching thread once I decide to do it.
There are only 8 days left in September before October will be here. That means I have to get my One Monthly Goal done or fail miserable (insert sad face). Well, not really. I could just roll it over to next month. But I had other ideas for next month. Sigh.
In the meantime, I have been working away at a course called Blame it on the Brain. It is about learning disabilities in children. I see myself on every other page Well, not quite. Just in the ADHD chapter which was a long one. I have lots of work yet to do but got the open book test done and recorded now to do the next thing.
Blessings,
Chris
linking with : needleandthreadnetwork. wednesday-wait-loss
Saturday, September 19, 2020
Slow Stitching and Fast Prepping
I took today to spend in my quilt room. Actually, this is also my office but my focus was on quilting. Kat at Next Step Designs a Canadian quilt shop in Calgary, is revamping the 150 Canadian Women BOW and I have decided to join in.
This was a year-long quilt-a-long back in 2017 to commemorate Canada's 150 Birthday. I started it about halfway through but did not get too far. It turns out that she was using more than just 2 colours. I had quickly cut out lots of bits using my GO cutter but ran out of steam.I have been plugging away at this Ella applique block. It is a bit fiddly the way I am doing it. I started with back-basting then changed it twice before doing a variety of techniques that make it fiddly. The petals overlap and I was challenged to find thread the right colour then find it again when I tidied up and could not find it. Twice.
And, I am having trouble threading a needle these days. Okay. The thread I am using for that coral colour is quilting thread. But it matches. Just does not thread so nicely into my #10 milliners's needles. Good thing I got some more Bohin needles. They are my favourite. I will finish this up tomorrow while watching schurch online.
I know I am supposed to be writing, but writing up a blog post IS writing too.
Blessings,
Chris
linking with: slow-sunday-stitching desgn-wall-monday- boms-away
Friday, September 18, 2020
Friday Night Sew-In on Sat Morning
Monday, September 14, 2020
150 Canadian Women Rerun and Goal Setting
![]() |
| Quilt-A-Long |
Next step quilt designs will be doing another quilt-a-long with the 150 Canadian Women project. You must have your own patterns to take part. I got all the patterns when they were free a few years ago when we celebrated Canada's150th Birthday. Since I had collected most of the patterns before I started it, I saw many of the blocks and decided to do a blitz cut out of many of the pieces with my GO cutter. However, I forgot that many of the blocks called for several colours. I had spent so much time making the tiny Dear Jane blocks in only one colour on a background, I forgot that some quilters use more than one colour in the same block. So that can be a goal for me to pull out the bin of fabrics and cut a bunch more pieces. I like the leader/enders, but have to realize that I need to be using the same colour thread for both projects. I am using a cream colour for this but white for the 3030 Quilt. Hmm. Too many decisions to be making this late at night.
It is 10 pm on a school night and most of the grandchildren are already in bed but not the eldest who is now in grade eight and wants 11 hours of sleep tonight as well as improving her math skills. The little boys moved into the trailer last night with their mom and cats. Dad will be arriving tomorrow after the movers move all their household stuff into storage until they figure out the next step.
In the meantime, it is time to decide on my 90 Day One Big Thing Goal for my writing group. And since I started a new mentoring group this week, I have decided to have the same goal for both groups. I am mentoring a group of Christian women and goal setting is our focus this week. I set goals all the time, but do I attain them? I have accountability and since I am the leader here, I probably should set a good example and meet my goals. In order to accomplish my goals for this fall, I really need to let go of some things to free up how I use my time. That was the object lesson using a jar to fill up with the things I am doing. So, I plan to give up computer games. Remember I spent at least 100 of those hours playing them last month?
So 100 hours per month for 3 months frees up 300 hours. And I was thinking that if I write for 1 hour a day (I was really thinking one page a day) then I should easily have a first draft by the middle of December. That is my logic. But the reality is, I do things in fits and starts, feast or famine, all or nothing. I have done way too much nothing for way too long. Now is as good a time as any to change. I have just been waiting for the school year to begin and life going back to some normal routines.
Now I am the one needing to improve my math. One hundred hours a month is more like 3 hours per day. That's like getting an almost full-time job.
Maybe I am the one who should go to bed.
Blessings,
Chris
linking with: katiemaequilts. and boms-away- needleandthreadnetwork. friday-night-with-friends.
Friday, September 4, 2020
Blogging Anniversary
My goodness!! How did this sneak up on me? I started blogging exactly 7 years ago today. I have published 525 blog posts. I have met countless quilters around the world. I have chronicled pretty much all the quilts I have ever started and those I have finished. I started a lot more than I finished. What a journey!
I am taking part, once again, on Friday Night With Friends. We each do our quilty thing at home and post about it then visit all the other quilters out there in blog land. I am continuing the hand applique on a few Ella blocks. My sister left for her home in Pakistan last night and I plan to reorganize my quilt room and tables and stuff to prepare for my daughter and her family moving in here next week. I have quilty ideas. We started a quilt together using my GO dies about 8 years ago. That has been sitting in a box for far too long. I think I will pull it out and put it up on the big design all and see where our inspiration will take us.Sunday, August 30, 2020
September OMG Goal
I am starting a new mentoring group later this month and we will start off talking about goal setting. What do I know about setting goals? I set goals all the time. Do I follow through on them to completion? Sometimes. Not always. I could learn a few things.
I have been limiting my quilting to the 3030 Quilt and Ella. The Ella blocks for this month are a few more doozy applique ones. Not sure that I will make all of them since I plan to only make 50 altogether and not all 85 like the original.
My September OMG will be to complete a few Ella blocks. Not promising any more than that. Non-quilting goals will be to complete one more of my courses.
blessings,
Chris
linking with: slow-sunday-stitching. design-wall-monday- link-party-patchwork-quilts- one-monthly-goal-september-link-up.
needleandthreadnetwork. midweek-makers- wednesday-wait-loss myquiltinfatuation. wendysquiltsandmore.

