Pages

Friday, May 18, 2018

Hand Work

 My 18 Hearts a Day for the Month of May
Keeping pace pretty good so far 
making one heart a day not making 31 hearts. 


Although, it's killing me to not be making more each day
so
I pulled out some antique Wedding Sampler kits 


 in anticipation of doing some 
English Paper Piecing
I photo copied patterns onto extra heavy freezer paper. 


In my inexperienced creativity,
I turned the freezer paper over
and ironed over the seam allowance


then whipped stitched the seams together. 
It worked fine for the first triangles
but totally fell apart for the second ones. 


Jonathan, who is turning 4 in a couple of weeks,
said he did not like this one 
because it looked scary.


so I changed the center octagon. 
He likes it better now. 
Still lots of applique to do 
but I am going away for the weekend with a bunch of junior highs. 


And 
since it is easy to prep several blocks once I get started,


I prepped 2 more
however


these blocks will all sit on point
so I have to re position this one. 


Good thing I noticed 
since there is another block exactly like this 
without the corner appliques. 

Blessings,
Chris

linking to 

Monday, April 30, 2018

A Heart A Day For The Month of May

Deb over at Happy to be Scrappy is stitching 
a heart a day in the month of May. 
I think I will play along. It has to be easy. 
So I pulled out some pre-cuts and ran them through the GO Baby.


Now I have a nice pile of four inch blocks and hearts.


The goal of this game is to stitch one heart each day
not stitch 31 hearts.
Blessings,
Chris

Saturday, April 28, 2018

Planning Plans to Plan for My May Plans

I have been wrestling with what my one monthly goal for May should be. It should be small and doable.

I have all the completed and in-process Dear Daughter blocks with their sashing strips and cornerstones on the small design wall. The top 8 are complete and stitched to the sashing and cornerstones. The lower 5 are in process. Since I started more than the required donuts and 2 alternate blocks, I am ahead of the game for next months blocks which will be released on Tuesday. I am hand appliqueing these. 


Dear Daughter Sampler


I was talking to a writing coach the other day and am instigating a 90-day goal for one "big" thing. You better believe quilting is not on that list of one "big" thing.  My 90-day "big" thing will be to complete the 5 doctoral courses that I have been pretending to work on for the past couple of years. After that, I will set another 90-day "big" thing goal.  It might be to complete the final 4 courses. It might be to finish writing my second book. I have pages and pages of notes in a box. I took them out to look through them one night before I left for the Shipshewana Retreat thinking naively that I could write a few more pages. Did not happen. I was having too much fun shopping and stitching and visiting. 

I have not played any computer games for 28 days in a row. Instead, I have been turning the computer off and doing other things. Even a bit of house work. But not too much. Today I put the 3 completed Dear Jane 2 blocks into a box and then put the Morrell blocks onto the big design wall. They are looking so good. Well, in my opinion. All 19 of them. But, alas, I am procrastinating yet again.  

I also have been tidying project boxes and putting them away in the cavernous quilt cupboard upstairs as well as clearing off my endless tables here in the quilt room. It is almost time to take the many geraniums outside for the summer and open the windows. The sun started shining in here recently and I cannot believe how prolific the cobs have been spinning webs this past winter.

I think I will be removing the dreadful machine quilting stitches from my first Dear Jane quilt and starting over. I found out what I had been doing wrong causing the quilt to drag instead of feed using the walking foot on no less then 2 machines. I am still waiting for the Brother to come home from servicing at the repair shop. It turns out that the feed dogs were not dropping because I was not able to turn the knob one more time to drop them. Something about arthritis and sore hands. 

Which brings me back to wrestling with what my OMG could be for May. It should be small and doable. I guess it is looking me in the face. I will finish 4 more blocks for Dear Daughter. That will give me 2 complete rows. I could sew them all together then couldn't I.  But then, I don't want to over do it. 

Blessings,
Chris

linking to 

Wednesday, April 25, 2018

Dear Daughter

It's hard to believe I have been home from 
Shipshewana for more than a week. 
How has the time gone by so quickly? 
I guess having little people here almost everyday does that. 
My OMG for April was to complete 8 blocks


and
prepare ALL the sashing and cornerstones 
for Dear Daughter. 


This way I can add them as I complete blocks each month. 
Feeling rather accomplished.
Blessings, 
Chris

Tuesday, April 17, 2018

Shipshewana Quilt Retreat April 2018



We left my place at 6 in the morning on Tues and arrived a bit before 3 in the afternoon. Since it was too early to check in we went shopping.










I took along 3 Antique Wedding Sampler kits in case I had extra time and wanted to do some hand work. I cut out all the little bits from extra heavy freezer paper and will do these by English Paper Piecing.



The retreat did not start until noon Wed so we went shopping. I bought a few fat quarters.








Wed night and Thurs  morning I sewed sashing strips and corner stones for Dear Daughter. I completed 2 blocks. I had stitched on the alternate block on the left last week when I was getting the oil changed in my car. I always get the oil changed before a road trip. Decided to leave the snow tires on. Good thing. We went shopping.







Thurs we went to see the musical Half Stitched. It is based on the book by Wanda Brunstetter set in Shipshewana with a quilting theme. We got
front row seats because we could. Then we went shopping.









There are so many of the most beautiful wide backs available these days. I only bought 5. Some of them are 115 inches wide. All these in anticipation of completing a few really big quilts.









Fri I worked on some yellow Bright Jane blocks.






Did I mention we went shopping? I bought a few Di Ford-Hall fat quarters and yardage.










Sat I worked on 2 Morrell blocks. I have to replace that one white piece on the end. And we went shopping.


Sunday I did some machine applique on the Huguenot Friendship Quilt using red silk thread. When the thread broke twice, I stopped.











The original Dear Daughter Quilt came out to play so I got to look really, really close at the blocks and sentimental inscriptions. It took my breath away with its simple beauty. I think I will change the green I started to use and find something softer.







I cannot understand why I did not get more sewing done in the 5 whole days we were there.

There was a severe winter (in mid April) storm in Ontario, but we left for home Mon morning and after 8 hours on the road, we arrived at the Farm where I got my car stuck in the snow.

Until next time,
Blessings,
Chris

Sunday, April 1, 2018

April 2018 Goals

I belong to several (18) facebook groups. Most of them are quilting groups.

 One of them is for the 1718 Coverlet that was made in 1718 a mere 300 years ago. There is a bit of a stir going on in the UK commemorating this amazing needlework which is the oldest known quilt in existence in the UK. I started mine on a whim 3 years ago after visiting my sister in England just as the pattern book was released. There have been numerous posting on the facebook group of completed and wannabes. I did not add this to my 12 ufos in 2018 but I think I might just do that.
Actually, I was looking for a blog post that had "gold" in it for Val's Tuesday Archives and this popped up.
 I have no intentions of trying to complete the thing this year or next, but I did pull the box out and revisited some of the completed blocks. I count 16. It appears that I took time to organize fabrics and cut out some freezer paper templates for the first 3 rows.






The RSC colour for April is yellow and gold. So, I decided it was time for Bright Jane to come out to play since winter is over. These are the yellow blocks I did not make last year. No idea how many I will make this year. Just in case, I pre-washed some more background and cut lots more strips and squares so I am ready.
 In the meantime, I am packing my bags to go to the Shipshewana Retreat  next week. I have been looking forward to this all winter when I get to play with my quilting friends for a whole week. Well, almost. We leave here early Tues morning and return the following Monday. It is a 7 hour drive each way. I am driving. I will buy chocolate to munch on. I have only 3 project boxes packed and ready to go. There will be 2 others with me and my stuff in my car so I am planning to go light.


1. I will be doing some more foundation piecing for my Morrell. I had all the fabric strips cut and the foundation papers cut and ready to go a few months ago. So I only had to put them in a project box. I have new insights to Broderie Perse applique, both by hand and machine. Some of these blocks will have flowers and birds stitched down with a narrow blanket stitch by machine. 




2. My Bernina is in for servicing before I start the machine applique on the Huguenot Friendship Quilt. I hope it gets back in time.
 I bought this on impulse (no surprise) when I saw an ad pop up on facebook. (I really need to stay away from there.)
This is a pre-fused kit and I have all 36 blocks arranged and pressed onto background squares. I am considering using a simple straight stitch with silk thread to match. I will test it out on some scraps first.

3. I have many strips cut to make up all the sashing and cornerstones for Dear Daughter. This is the newest block of the month from sentimentalstitches
This will be my hand stitching project for this month. The April blocks have been released and I have them all prepped and ready to hand applique. None of those in the picture are stitched down yet. 



My one-monthly-goal for April will be to make all the sashing and corner stone units for Dear Daughter AND complete the hand applique on the first 8 blocks. This should be doable since I have quite a few prepped already and will be Slow Sunday Stitching for a few minutes before all the grand children come for a sleepover at the FARM. There is no school on Monday and there will be no me time for the rest of the week.

Blessings,
Chris