It is hard to believe that the Shipshewana Quilt Retreat was a whole week ago. Where does the time go? I had taken 5 projects to work on. I worked on 4 of them. I am such a dreamer and maybe a bit lacking in time management skills but we won't go there. At least not for now.
I took Almost Amish Irish Chain an old ufo to work on. It was supposed to be simple. I thought maybe 2 days to sew it together. But on day 3, Saturday, I realized that I was short on the tone on tone white background fabric so bought something similar and cut out the strips only to realize that I need yet more strips so back to the quilt shop. When I got home and continued to work on it, I found that I had cut many of the strips 3 x 7 instead of the required 3 x 8. So, I decided the finished size would be 84 x 84 before borders instead of 84 x 108. Now to sew all those blocks together before they fall off the wall or get mixed up.
I did get a bit of hand work done on one Beyond the Cherry Trees Block. I don't know why I did not do more hand work. The fact that I went shopping 5 times, had three 3 hour naps, went to the pool 4 times and talked half the night with my roommates, has nothing to do with that. At least I don't think it does.
I have yet to complete the insides of those 3 flowers and create 2 more. They will be challenging. But then, I always liked a challenged. At least that is what I have often said.
I will be working on this block and prepping the next one as my Slow Sunday Stitching project.
I used some of the red and white bits I had cut out with the GO Baby 2 years ago for the 150 Canadian Women BOW as leaders and enders. I did get 6 Morrell blocks machine appliqued. That was easy once I found the missing presser feet and bobbins. What I did not pull out to work on is the machine applique Huguenot Friendship Quilt Blocks. Maybe next retreat.
Oh, I also wrote a couple of chapters for SMOWJ. So the retreat was quite successful after all.
Blessings,
Chris
I took Almost Amish Irish Chain an old ufo to work on. It was supposed to be simple. I thought maybe 2 days to sew it together. But on day 3, Saturday, I realized that I was short on the tone on tone white background fabric so bought something similar and cut out the strips only to realize that I need yet more strips so back to the quilt shop. When I got home and continued to work on it, I found that I had cut many of the strips 3 x 7 instead of the required 3 x 8. So, I decided the finished size would be 84 x 84 before borders instead of 84 x 108. Now to sew all those blocks together before they fall off the wall or get mixed up.
I did get a bit of hand work done on one Beyond the Cherry Trees Block. I don't know why I did not do more hand work. The fact that I went shopping 5 times, had three 3 hour naps, went to the pool 4 times and talked half the night with my roommates, has nothing to do with that. At least I don't think it does.
I have yet to complete the insides of those 3 flowers and create 2 more. They will be challenging. But then, I always liked a challenged. At least that is what I have often said.
I will be working on this block and prepping the next one as my Slow Sunday Stitching project.
I used some of the red and white bits I had cut out with the GO Baby 2 years ago for the 150 Canadian Women BOW as leaders and enders. I did get 6 Morrell blocks machine appliqued. That was easy once I found the missing presser feet and bobbins. What I did not pull out to work on is the machine applique Huguenot Friendship Quilt Blocks. Maybe next retreat.
Oh, I also wrote a couple of chapters for SMOWJ. So the retreat was quite successful after all.
Blessings,
Chris