Only one quilting goal this month. To finally complete GORF since we decided to gift it for a wedding this month. So, I guess I need to get busy. The appliques are all fused and cut out with GO dies and machine appliqued. I machine quilted the 16 squares and have yet to connect them. Wish me luck. Never done it this way before. I still have to machine quilt the borders. But I want to connect all the blocks together before completing the ends of the swags on the borders because I want those flowers to land in the right place.
I started this project more than 3 years ago as I was experimenting with applique GO cutters and this crazy idea that I could make one of these in a weekend. Huh! I have taught the class twice and then I made GORF 2 back in May.
It probably took the better part of a week when I add up all the hours I did work on it. I assembled the whole thing than rented time on a longarm at a local quilt shop and did an simple edge to edge design. That was a bit pricey, but it was done 2 weeks before the wedding so I was happy.
Blessings,
Chris
Monday, August 1, 2016
Saturday, July 30, 2016
July 2016
Where has the month gone?
I did not get much of anything finished in the manner of quilting this month.
And I had such good intentions.
I stitched
a bit of Morrell
and a bit of 1857
However,
On July 3rd I got a phone call from our daughter in New Brunswick saying they decided to go on an "adventure." That meant only one thing. They were loading the van with babies and diaper bags and overnight bags and getting a cat sitter so they could do the 16 hour drive to the Farm here in Ontario. It took them 21 hours, but what do you do with a 2 year old at midnight who gets to the top of the slide in McDonald's play place and won't come down? They spent a couple of days at the Farm and a couple of days at his parent's then he drove home . . . Alone. She had the flight details for my planned trip to visit her on her birthday so, called Air Canada, bought herself and Jonathan a ticket, arranged to have Baby David on my ticket and so we all flew off to New Brunswick together. It was great. So, instead of doing all the stitching I had planned, I snuggled little boys, wiped noses, change many dirty diapers and had wonderful time and the little girls even came to visit.
| pedicures |
| um . . . how do you drive this thing? |
| 3 year old Devan teaching 2 year old Jonathan how to drive |
| eating Popsicles |
| 4 year old Elly helping with laundry |
| Grampa's little helpers |
| putting on David's shoes |
| need a bit of help |
| Will Gramma's giant shoe horn work? |
| feeding chickens |
| watering flowers |
| kicking the ball |
| feeding babies |
| baby on grass |
| and Baby David started on solids |
| picking raspberries |
| picking more raspberries |
And now July is in the archives and my heart is really full.
Blessings,
Gramma Chris
Sunday, July 3, 2016
OMG July Quilting Goals
As the saying goes . . . Go big or go home . . .
I had a big project on the go for the past 2 months that I could not blog about, so could not commit to completing anything else that was of any size. For my July monthly goal, I want to start and complete the center block for the Morrell Album Quilt . I have so neglected this one. I had good intentions of making one block a week. That lasted for one week. Maybe two. This center block measures 20 inches square and is not for the faint of heart. That has never stopped me from trying. So, try I will.
The first thing I did was change my mind about the colours. There will
be lots of detail on this one with applique and surrounded by a daunting
red and cream dog tooth border. There are several ways I could approach
this block. I am going to give hand piecing a try. At least for that pinwheel.
Also, I want to complete the GORF quilt by connecting all the quilted blocks together. It will be the first time using this method, do wish me luck.
Blessings,
Chris
I had a big project on the go for the past 2 months that I could not blog about, so could not commit to completing anything else that was of any size. For my July monthly goal, I want to start and complete the center block for the Morrell Album Quilt . I have so neglected this one. I had good intentions of making one block a week. That lasted for one week. Maybe two. This center block measures 20 inches square and is not for the faint of heart. That has never stopped me from trying. So, try I will.
| Morrell Center Block |
Also, I want to complete the GORF quilt by connecting all the quilted blocks together. It will be the first time using this method, do wish me luck.
Blessings,
Chris
Saturday, July 2, 2016
Slow Stitching Quickly
Its Canada Day here in our beautiful country. We finally have some rain. I am home for 3 whole days with no responsibilities and of course, this means quilting time!! The July 1857 blocks were posted an hour ago and I have all three prepped and ready to go! Yea me. And since I have at least 10 blocks with the corner leaves stitched on, these should not take too long.
I have been sick with a dreadful head cold throat thing this past week. I hope it is gone soon and I have my voice back, since the little girls are tired of me whispering at them. Four year old Elly is coming over for the week and she will be going to Vacation Bible School for the first time. I start leading a small group for the summer once again. This time we will be working our way through a booklet our pastor wrote called "Hearing God". So, for the next nine Tuesday nights, we will be on a journey to learn to quiet ourselves, and listen for the still, quiet voice of God and journal. This is not always easy for someone who operates out of a slightly ADHD mindset. Learning to still my thoughts and lean into God is a challenge for me, but I am the group leader, so I have to do all the homework first. Its going to be good. No. Its going to be amazing.
I bought tickets for our ministry trip to India in October. At the VBS they will be collecting school supplies for us to take along for one of the children's homes.
I got two of the blocks done. Just need to do some embroidery. More perfect circles.
Blessings,
Chris
I have been sick with a dreadful head cold throat thing this past week. I hope it is gone soon and I have my voice back, since the little girls are tired of me whispering at them. Four year old Elly is coming over for the week and she will be going to Vacation Bible School for the first time. I start leading a small group for the summer once again. This time we will be working our way through a booklet our pastor wrote called "Hearing God". So, for the next nine Tuesday nights, we will be on a journey to learn to quiet ourselves, and listen for the still, quiet voice of God and journal. This is not always easy for someone who operates out of a slightly ADHD mindset. Learning to still my thoughts and lean into God is a challenge for me, but I am the group leader, so I have to do all the homework first. Its going to be good. No. Its going to be amazing.
I bought tickets for our ministry trip to India in October. At the VBS they will be collecting school supplies for us to take along for one of the children's homes.
I got two of the blocks done. Just need to do some embroidery. More perfect circles.
Blessings,
Chris
Friday, June 24, 2016
June OMG Finish
I set out to learn how to do the Karen K Buckely's Perfect Circles
and complete these 4 blocks for the 1857 Album quilt-a-long.
These ones weren't too hard once I found the missing circle.
For some strange reason it ended up in the middle of the Dear Jane 2 box.
Good thing I pulled out the completed blocks to put up on to the empty design all.
These circles are small and smaller.
Since there were only 4 of one and 3 of the other sizes,
I made 7 circles at a time using 7 needles and waiting for them to dry before stitching them down.
I made 7 circles at a time using 7 needles and waiting for them to dry before stitching them down.
Then I made more until I had enough. Then unstitched them and re positioned and re stitched.
The circle looks more round now. The bird will need some feet.
Between little boy grand children visiting and babysitting little girls, driving tractors, breaking a tooth and having it pulled and catching a throat thing from one of those little girls, I did not get too much stitching done this month. AND, my publisher finally sent the proofs for my book Denine: One mother's journey with a profoundly handicapped child and now I am in the first revision round. I have no less than 5 areas to address, including a larger font and the dedication. AND, did I mention my daughter and her family are moving back to Ontario in September???? Those little boy grand children will be a mere 3 hour drive away instead of a 3 hour flight. Bring on the summer!!
Blessings,
Chris
Tuesday, June 14, 2016
Drum Roll Please . . . A Completed Quilt!
This is what I have been working on for the past few weeks. GORF 2
I could not post or boast about it . . .
. . . until it was gifted to our friends for their farm wedding
The bride and her posse showed up in grand style
The guys wore green
The girls wore purple
The bride's tractor is red and the groom's is green.
I got to drive the team . . . Penny and Tammy were very cooperative for this first timer.
My husband insisted that I could and should put the invitation photos on the quilt.
Steep learning curve but I got it now.
He designed the layout.
I did an edge to edge on the longarm that I rented time on last month
and had this whole thing quilted and bound 2 weeks in advance.
Chris
Wednesday, June 8, 2016
View From My Green Tractor
Here on the Farm I do other things besides quilting. This is a real working dairy farm and even though I am retired, I still get to drive tractors once in a while. I was tedding hay last week and as I was driving round in circles and back and forth, I was flooded with memories and mentally wrote a couple of books as I reflected on my 45 years living and working on this farm. Now I was born and raised on a dairy farm and married a dairy farmer and officially milked cows full time for 18 years, but I had to retire from doing all that because of osteoarthritis and lower back issues. Driving tractor is something that I can still do.
Blessings,
Chris
| View from my Green Tractor |
My Sweet Husband cutting hay with the other Green Tractor
| The Other Green Tractor |
The darker green is the fresh cut hay.
The lighter green is the hay cut the day before that I was tedding.
What is tedding? Basically turning over and fluffing up the hay so it will dry faster.
| One of the Hay Fields |
Getting instructions about speed and technique before I start.
| My Sweetie |
He called the local John Deere dealership and told them
that his wife broke 2 teeth.
| Our Mechanics |
I got to quilt the rest of the day.
| Our 1840's Farm House |
Blessings,
Chris
Subscribe to:
Posts (Atom)