The first time I ever heard of the The Morrell Quilt was reading about Carole's completed one in Sept. See the picture here
I tracked down the pattern at Threadbare and ordered it in Nov, then had to wait a couple of months until they could print off a copy for me and paid the unheard of sum of $30 to have it shipped to me late Feb.
So, will I make this amazing sampler quilt? I sure hope so. I have the perfect background and 2 yards of a red French General sort of solid that I am using for BTCT. Will there be enough for both? Probably not, but I don't have to worry about that right now. I am determined to complete Dear Jane this month.
My old printer is dying a very noisy death and last night I got the brand new one installed and functioning properly after asking for help so I was able to print off the new BOM patterns. Then I wrote a Quilt Goals for July list while I was watching Pride and Prejudice on my laptop and prepping blocks and then could not get to sleep.
- Top of the list is prep CCCQ #23. Check.
- Prep BB #6 & #7. Partly done. I have to remember that I am machine appliqueing these.
- More prep on BTCT # 4. Need more 1/4 inch bias strips. I turned the green print fabric over to use the back for some of the leaves and thought I would make bias strips out of the solid back.
- Complete BTCT # 17 which I prepped and took with me last week. Should get it done tonight.
- I had booked time on a longarm for next week to quilt a disappearring 9 patch my daughter made for a wedding quilt for next month. Today I went looking for a suitable wide backing. Got really lucky to find the flannel wide backs 30% off so I bought the rest of the bolt of some plain white to use instead of batting and enough print for 2 queen quilt backs. Have to preshrink it first.
- Complete Dear Jane.
- Complete GORF. The Red and Green GO Real Fast Quilt has been sitting patiently in a neat pile all layered and ready to complete the machine quilting in sections. I marked the cross hatch lines while babysitting back in the spring, then blitzed Dear Jane triangles. I have 3 girls all ready to go to do the weekend retreat as soon as we can all agree on a date. The plan is to prepare ALL the blocks and borders and get most of it machine appliqued in a weekend using my Go cutter gadgets. I do plan on making another one. This one will not be in traditional colours.
- Get started on my son and daughter in law's Bali Wedding Star Quilt by Judy Neimeyer. I tracked down enough foundation patterns and fabrics for a king size last year and have not yet started it. Maybe I can get it done for their anniversary in Sept. Maybe.
Chris